Barlovento's Projects

Hurlburt Ball Field (This is part of the FY-07 Dorm Job)

Name of Project: Hurlburt Field Ballfield

Location of Project: Hurlburt Field AFB, Florida

Owner: United States Air Force

General Scope of Construction:
Construct New Ballfield including Site Lighting, Landscaping, New Masonry Dugouts, Irrigation System and Landscaping.

Date Construction Began: 1 November 2007
Scheduled Completion Date: 1 April 2008



Name of Project: Base Pool

Location of Project: Hurlburt Field AFB, Florida

Owner: United States Air Force

General Scope of Construction:
Resurface Pool with Gunite Finish, Remove and Replace All Tile, Replace Existing Concrete Decking and Pavers with New Concrete and a poured Rubberized Safety Decking, Remove Existing and Install New Aluminum Fencing around entire Perimeter of Pool Area.

Date Construction Began: 5 November 2007 
Scheduled Completion Date: 7 April 2008


BarloventoBarlovento


Name of Project:    Construct Consolidated Emergency 911 Facility

Location of Project:      Moody AFB, GA

Owner :   23rd Contracting Squadron

General Scope of Construction:   Remodel and add to the existing Security Forces law enforcement desk area to create a consolidated emergency response center for Moody AFB, GA  

Dates Construction:  Began     December 17, 2007                  Completion Date:     May 15, 2008
 


Repair Dog Run & Gate

Center of Disease Control  ATLANTA  GA      

Description: 
Remove & install MMA Flooring for one full dog run, interior & exterior.  Replace all fencing around the Dog run.

 Contract# 200-2003-01287-0006    

1/2008-3/2008

 


F22-A Weapons/Tactical Trainers Addition, Tyndall AFB, FL

Location of Project  Tyndall AFB, FL

Owner  USACE, Mobile District

General Scope of Construction Project Construct F22-A Weapons/Tactical Trainers Addition including all site work at Tyndall AFB, FL. Construction includes but is not limited to Fabrication and Erection of Structural Steel components, Standing Seam Metal Roof, Raised Floor System, Electrical, Mechanical, and Plumbing installation, Masonry including CMU and Block Fill, Installation of Wet Pipe Sprinkler System,  Fencing, Installation of Overhead Coiling Doors, Resilient Flooring installation, and landscaping.

Dates Construction:  Began 05/10/2007 Completion Due Date (03/2008)


Name of Project  Dormitory, 50 Rooms

Location of Project:  Hurlburt Field, FL

Owner  USACE, Mobile District

General Scope of Construction Project Design and Construct a 50 sleeping room dormitory with admin spaces and supporting utilities.  Facility construction will consist of reinforced concrete foundation and floor slabs, masonry walls, standing seam metal roof, fire detection and suppressions, bath modules, training support areas, laundry, and storage areas.  HVAC, electrical, and comm. systems area required.  The project will include relocation of existing base ball lighting poles and construction of a new base ball field.

Dates Construction:  Began  August 2007  Completed  12/22/08

Barlovento

 


Name of Project  FBI Secure Training Facility

Location of Project:  Redstone Arsenal, AL

Owner  USACE, Mobile District

General Scope of Construction Project Construct a one-story, administrative, training facility with a secured classroom, and a 15’ high workshop, lightproof room and vehicle bay.  This facility consists of 9,227 SF of air-conditioned space and 11,147 SF total including outside covered space.  This facility will contain a space to process secret communications and data in a SCIF environment.  A primary function of the FBI staff is to train personnel on special equipment and prepare vehicles for deployment.  The facility also utilizes communication and data that is received and transmitted over SIPREnet and NIPREnet environment.  An extensive communication/data system will be installed to include fiber and copper conductors.  Other electronic systems include a mass notification.

7/2007-7/2008

DesignDesign


Name of Project  BRAC Projects

Location of Project:  Columbus Air Force Base, MS

Owner  USACE, Mobile District

General Scope of Construction Project Construct repair of Centralized Aircraft Support System (CASS).  Design, Construction, and Site Work for ADAL Squadron Operations, Building 236.  Design, Construction, and Site Work for IFF Squadron Operations Facility.  Design, Construction, and Site Work for ADAL Flight Simulator, Building 268.

Dates Construction:  Began  August 2007  Completed  in progress

 


Name of Project  Hurricane Katrina-Replace CE Complex

Location of Project Gulfport, Mississippi

Owner  U. S. National Guard

General Scope of Construction Project Design-build project for renovations and repairs to hurricane damaged exterior areas, complete gutting and rebuilding of the interior, upgrades to the HVAC systems, installation of new sloped standing seam metal roofing system, replacement of exterior metal fascia/wall panels, demolition of Building 140, construction of an 800 square foot addition to Building 132, construction of a new Shops Building, installation of new central air-cooled chillers, and construction of all improvements. 

Dates Construction:  Began  November 2006  Completed  10/2008 


Government agency- COE  Fort Rucker AL
Building Number – 4901
Contract Type- COE Design
Project Title-Repair / Remodel Pratt Hall
Period of Performance December-07- December-08

Description-  Pratt Hall was a simulator building.  We are converting this building to class rooms & labs. The work consist of demolition of existing rest rooms & Electrical rooms, the removal of asbestos floor tiles & block walls containing lead paint. The entire electrical & plumbing system will be reworked. We are transforming the simulator bay area in to class rooms & labs by the use of 2x6 metal studs & gypsum board extending from the floor to the deck @ a height of 28 feet. We are installing an access flooring system. The ceiling will be 2x4 lay in acoustical tiles. The central core area will be renovated offices, Restrooms & break rooms. This job is scheduled to complete in December of 08.


Company / Government Agency – Centers for Disease Control & Prevention
Building Number – 110
Contract Type – BOA Task Order
Project Title –  Chamblee Building 110, Fume Hood Upgrade
Period of Performance – 09/27/2007 - 03/31/2008
Description – Demolish and cap existing 10" round duct in interstitial space.  Install 12" Phoenix Control Valves and connect to the building automation system.  Connect to Government furnished Fume Hood with 316 stainless steel visible below finished ceiling.  Test and balance new hood exhaust system.


Company / Government Agency – Tyndall AFB, FL
Building Number – Red Horse HVAC Shed
Contract Type – Design Build
Project Title –  Pole Barn Addition
Period of Performance – 12/04/2006 - 01/29/2007
Description – Construct a 33' x 61' x 8" concrete slab open air steel structure with columns spaced to match existing pole barn.  Structure shall be capable of withstanding wind loads up to 130 mph.


Company / Government Agency – Ft. Rucker Alabama
Building Number – Silver Wings Golf Course Clubhouse
Contract Type –
Project Title –  Renovation and Expansion of Silver Wings Golf Course Clubhouse

Period of Performance – May 2, 2008

Description – This project includes the enclosure of an existing open air pavilion to become a special event dining room; renovation of the existing kitchen and grill line to reconfigure and incorporate new food service equipment; and renovation of eisting dining room to add bar and upgrade finishes. 



Building Number – Secure Training Facility
Contract Type – Construction Bid, Their Design
Project Title –  Construct FBI Secure Training Facility

Period of Performance – Approx. 8 mos.
Description – Construct new facility for the FBI at Redstone. Project began in August 2007.

 

ft1ft2ft3


Company / Government Agency – Ft. Rucker Alabama

Building Number – 60102

Contract Type – Negotiated Design Build

Project Title  Remodel of bldg 60102, Flight Tower at Shell Field

Period of Performance – Nov 1, 2007

Description – Design and Re-Model the Communications Flight Tower for Shell Field, Project Included swinging all communications circuits to temporary tower, both Fiber and Copper Cabloes.

ft1ft3


Company / Government Agency – Hurlburt Field USAF

Building Number – HMXS

Contract Type – Negotiated Design Build

Project Title  HMXS

Period of Performance – Oct 16, 2007

Description – Design and build a pre-engineered steel metal building approx 3250 sf.


Company / Government Agency – Hurlburt Field USAF

Building Number – PT Clinic Addition

Contract Type – Negotiated Design Build

Project Title  PT Clinic Addition

Period of Performance – Oct 1, 2007

Description – Provide an addition for the existing PT Clinic at Hurlburt Field.   Our responsibilities included both the Design and build/construct a pre-engineered steel metal building addition equaling approx 2730 sf


Company / Government Agency – Climate Controlled Env Storage Facility - Camp Rudder, Eglin AFB

Building Number – New construction

Contract Type – Negotiated Design Build

Project Title  PT Clinic Addition

Period of Performance – Sept 14, 2007

Description – It was Barlovento’s responsibility to Design and build a 10,438sf. Controlled Environmental Storage Facility.

 


Company / Government Agency - Hurlburt Field -USAF Hangar Fire Suppression System

Building Number - 90825

Contract Type - Competitive Bid

Project Title - Fire Suppression System

Period of Performance - Oct 10, 2006 €“ Jun 15, 2006

Description - Our contract consisted of providing and installing a High Expansion Foam suppression system. The material that is contained in this system expands over 800 times once water is added to it.  It also affords easy clean-up with water and is environmentally safe.
The Final Test -  The last 2 photos are of the actual final foam test that took place July 23.  This test took 1 minute and 15 seconds to fill the hangar to a depth of 1 meter completely with foam. Very impressive.

 TestTest

 



Company / Government Agency - Camp Shelby Army National Guard Base

Contract Number -

Contract Type - MATOC

Project Title - Repair /Replace/Test Critical data cables on ranges 45 and 48

Period of Performance - 5 days

Description - Provide, install and test over 2 miles of Specialty Copper cable for target data transfer, on an active/live tank bombing range.


Company / Government Agency - Albany Marine Base - Construct Drive Through Refuel/ Defuel Station           

Contract Number -     

Contract Type - (8a, set aside)

Project Title - Construct Drive Through Refuel/ Defuel Station

Period of Performance - (180 Days- 18Sept06-16April07: extended to 31May07 for Change Order)

Description - Installed 2-1000 Gallon Tanks and 2-6000 Gallon Tanks. Also constructed a new 22€™x15€™ Oil/ Grit Interceptor for storm water and oil and grit drainage.


Company / Government Agency - Ft Rucker Army Base           

Contract Number -     

Contract Type - 8a set aside

Project Title - Lowe Field Culvert Repair

Period of Performance - 180 Days (25Sept06-23April07)

Description - Replaced 60€™ broken concrete culvert pipe with a new 72€™ Asphalt Lined RCP pipe and placed new 17€™ x 8€™ Manhole. Constructed diversion ditch and 2- temporary berms for water


Company / Government Agency - USACE - Eglin AFB         

Contract Number -     

Contract Type - New Construction – Corps of Engineers, Mobile, AL

Project Title - Boat Storage

Period of Performance - 365 Days€“ Sept. 14, 06 thru Sept. 14, 07

Description - General Contractor for Design Build - 2 facilities approximately 10,478 sf.  Both bldgs. are pre-engineered metal bldgs.  All sitework including underground utilities to completion of architectural finishes


Company / Government Agency - Hurlburt AFB - Admin Addition       

Contract Number -     

Contract Type - New Addition €“ Air Force

Project Title - Bldg. 90220

Period of Performance - 210 Days completion May 28, 07

Description - General Contractor for a 2,500sf addition constructed of cmu walls, exterior EFIS finish with a standing seam metal roof.


Company / Government Agency - Hurlburt AFB - Command post addition         

Contract Number -     

Contract Type - New Addition/Alteration Air Force

Project Title - ADAL Command Post Bldg. 90208

Period of Performance - 320 Calendar days April 17, 06 March 2, 07

Description - General Contractor for new 9,800 sf addition plus alterations to interior and exterior of existing facility

Barlovento also provided and installed the secure sipr and niprnet lan systems for hurlburt. (last 2 pics)


Company / Government Agency - Gulfport MS         

Contract Number -     

Contract Type -

Project Title -

Period of Performance -

Description - Demo CE Complex


Company / Government Agency - City of Niceville       

Project Location - Niceville, FL   

Contract Type - Addition    

Project Title - Library Addition

Description - Design Build.  Barlovento will be building a addition to the Niceville library.

DesignDesign

Company / Government Agency - USACE, Savannah

Project Location - Fort Benning Army Base, Columbus, Georgia

Contract Type - Military

Project Title - Design/Build Digital Range for tank training

Period of Performance - 4/01/2005 – 11/01/05

Description - Design Build.  Barlovento will be a subcontractor for McKnight Construction on the Digital Range project.  This job consist of heavy civil and general building construction for this large Corps of Engineers project.    

DesignDesign

Company / Government Agency - USACE, Mobile

Address - P.O. Box 2288 Mobile Alabama 36828-0001

Project Location - Fort Rucker Army Base, Daleville Alabama

Contract Type - Military

Project Title - Design/Build MWD Kennel

Period of Performance - 6/04 – 5/17/05

Description - Design Build.   Provide design and construction 3,000sq/ft facility with administrative and dog kennel space, storage building and associated site work.

DesignDesign

Company / Government Agency - Eglin AFB       

Contract Number -     

Contract Type -

Project Title - C Range

Period of Performance -

Description -Install 165,000 lf of duct bank and fiber optic cable.  Associated splicing.

DesignDesignDesign

Company/ Government Agency -  Center for Disease Control and Prevention, Atlanta

Address - Press Briefing Room, Bldg 16 Atlanta Georgia  30341-5539

 Project Title - Roybal Cafeteria Renovation

Period of Performance – 4/2004- 8/2004

Description - Demolition and Remodel- This was completed fast track in a dust free environment.

DesignDesign

Company / Government Agency -

Contract Number -     

Contract Type -

Project Title -

Period of Performance -

Description -

DesignDesign

Company / Government Agency - United States Air Force   

Contract Number - FTEV 03-1164

Contract Type - Build wash rack for Helicopters

Project Title - Construct Canopy - Helicopter Wash Rack

Period of Performance -

Description -This was a build with the Air Force for a wash rack to clean the helicopters flying into and out of Hurlburt Field.

DesignDesign

Company / Government Agency - Eglin AFB, Florida

Address - 204 West D. Avenue, Ste 541, Eglin AFB, Florida 32542

Contract Number - F08651-03-C-0055   

Contract Type - AFB Military

Project Title - Design/Construct Pool Cover with Tear Down

Period of Performance - 11/03 - Present

Description - Design Build.    Provide all labor, materials, and supervision for a Design/Constructing an Air Supported Pool Cover.

Design

Company / Government Agency – Eglin AFB, FL

Address - Contracting, AAC/PKO1, 205 West D Ave,  Eglin AFB, FL  32542-6862

Contract Number - FO8651-03-C-0007

Contract Type - AFB, Government

Project Title - Seabreeze Bldg #17

Period of Performance – 9/2003-8/2004

Description - Design/Build 

DesignDesign

Company / Government Agency – Eglin AFB, FL

Address - Contracting, AAC/PKO1, 205 West D Ave,  Eglin AFB, FL  32542-6862

Contract Number - FO8651-03-C-0049

Contract Type - AFB, Government

Project Title - Design/Renovate Bldg 3086

Period of Performance – 9/2003- 2/16/2005(Completion Date)

Description - Design/Build  Provide the remaining 65% design, labor , materials and supervision to accomplish renovations on Building 3086

DesignDesign

Company / Government Agency - Centers for Disease Control and Prevention- Atlanta Georgia

Address - Press Briefing Room, Bldg 16 Atlanta Georgia  30341-5539

Contract Number - 200-2003-01447   

Contract Type - Press Briefing Room Conversion

Project Title - Convert Class Room 1111 to Press Briefing Room

Period of Performance - 07/11/2003 – 9/10/2003

Description - Demolition and Remodel  CDC “Dust Free Environment” High profile Fast track project.

Design

Company / Government Agency - Eglin AFB, Florida

Address - Santa Rosa Island

Contract Number - FA2823-05-C-0018   

Contract Type - Fiber Optic instillation

Project Title - Install fiber optic cable

Period of Performance - 02/23/2005 – 09/30/2005

Description - Install fiber optic cable for Air Force testing on Santa Rosa Island

Design



U.S. Small Business Administration 8(a) certified Woman-Owned, Hubzone, GSA 

Barlovento is a certified woman-owned company and possess the following SBA approved NAICS Codes :

42169, 23492, 23593, 56111, 541611, 56121, 23531, 48423, 334511, 23332, 51333, 51334, 23491, 23531

GSA Contract Number: GS-35F-0632K, CAGECODE, 1GJZ6

CMAS Contract Number: 3-01-70-1456A